Do you have an advertising offer to propose or would you like to make a name for yourself through House from Factory with your products on the market ?
Do you have an idea for a joint campaign, video, joint education, trade fair, TV show?
You have not found a ready solution for yourself …. nothing lost.
In the presented projects you can make adaptations and necessary changes.
It is not always worth it, therefore, we can also design for you a dream house from scratch (taking into account the needs of your family, land conditions and local development conditions).
If you already have a finished project from another company – we are able to price its construction if we get the right materials.
Opis?
Pod tą nazwą kryją się wszystkie technologie budowy, w których gotowe ściany i duże elementy budowlane wytwarza się w fabryce, poza miejscem budowy.
Podstawowa cześć procesu budowy zaczyna się w fabryce. Wszystkie duże elementy takie jak ściany, dachy, schody czy stropy przygotowywane są w zakładach produkcyjnych metodami przemysłowymi.
Obecnie technologia prefabrykacji jest coraz bardziej zaawansowane i pozwala na wysoki poziom dokładności jakości i unikaniu typowych błędów.
The house is made of prefabricated timber frame technology.
This range that is most often ordered. We make it for developers and individual customers.
The offer assumes the manufacture and installation of the elements, which will be produced in the manufacturing plant, along with the protection of the roof from precipitation.
Such a scope allows for a very short installation – the whole house about 3 – 5 days – and thus a reduction in costs.
Only typical construction, installation and finishing works will remain to be done.
The Standard+ Package is an expanded standard package with 7 additional elements
The Standard+ Package is the construction of your Z500 Collection home from shovel driven to exterior finish. The package price does not include installation and interior finishing.
The house is made of prefabricated timber frame technology.
This range that is most often ordered. We make it for developers and individual customers.
The offer assumes the manufacture and installation of the elements, which will be produced in the manufacturing plant, along with the protection of the roof from precipitation.
Such a scope allows for a very short installation – the whole house about 3 – 5 days – and thus a reduction in costs.
Only typical construction, installation and finishing works will remain to be done.
This is a basic program to get started. It allows investors to start construction and then with their own labor or local teams continue it. It’s not quite as popular still today in Eastern Europe, but it resembles it a bit. The Basic (mini) package gives you the huge advantage of professionally assembling the timber frame that makes up the structure of our house within 2 days.